Cooling Towers Cooling TowersHOMESite MapCooling TowersAbout UsFinancingEngineering DataPhoto GalleryCooling Tower SystemsWarrantyContact UsAssembly Instructions
Engineering Information

Cooling Tower Specifications / Drawings

Engineering Brochure

Cooling Tower Assembly Man Hours

Assembly Drawings & Parts

Motor Drawings

V Belt Speed Reducer Replacement
Parts Drawings


Heater and Control Panel Specifications

Heat Exchangers

Water Pump Selection


Product Literature
& List Price

T-2 Cooling Tower Sets List Price

T-2 Model Cooling Tower
Replacement List Price

Low Noise Cooling Tower List Price

Stainless Steel Optional
Add-On List Price

Fan Motor List Price

V Belt List Price

V Belt Speed Reducer
Replacement Parts List Price

Extension Skirt List Price

Winterization Basin Heaters &
Heater Control Panel

Vibration Isolation Mounts List Price

Request For Quote
Cooling Tower Selection

Water Pump Selection
New Surplus Parts & Equipment
Photo Gallery
Terms & Conditions
Warranty

 

Maintenance and Control

Download the Complete Operating Instructions & Service Manual in PDF format  

(274 KB, requires Adobe Acrobat Reader)

 

5.1 Sprinkler Pipe

The sprinkler pipe must be clean without blockage.  If there is some foreign material retarded in the pipe, take the following steps:

(A)    Loosen the set screw or lock nut on sprinkler device, then remove sprinkler pipe and clean.

(B)    Align the dot mark on sprinkler head and reinstall.

For T-28 – T-215 models, they are fitted with type A and B pipe (the hole pitch is different to assure even water distribution.

5.2 Sprinkler Head

The sprinkler head rotation will slow or even stop if scale is stuck to it.  In this case, check it as follows:

(A)    T-25 – T-260 (refer to Fig. 1)

a.      remove set screw cap on top of sprinkler head.

b.      loosen nut and washer, then take head off.

c.      clean it with fresh water and check if any component is worn out.

Fig 1

(B)    T-270 – T-3000 (refer to Fig. 2)

a.      remove the cap and take circlip off.

b.     pull the rotary part off the fixing part and check: replace if necessary.

Fig 2

5.3 Tower Casing

No coating is needed for the tower casing as it is made of F.R.P.  If it becomes soiled, wipe it with soap or a water-soaked piece of cloth and then wash it thoroughly with water.

5.4 Water Basin

As dust and dirt are liable to get into the water basin, open the drain at the bottom of the drop-in tank from time to time and wash it clean.  This applies also to the water basin in particular, as sediments are liable to accumulate near the outlet, so keep the tank clean so that the strainer mesh will not be clogged.

5.5 Filling

No special care is needed if the control of the quality of water is adequate during operation.

5.6 Fan

Watch the surface of the blades carefully to see that no damage develops and make sure that proper space is maintained between the internal wall of tower casing and the tip of blades.

5.7 Coating

It is desirable to periodically recoat the metal parts as they are subject to rusting.


Tel; (800) 752-1905 / (478) 755-1905
Fax: (800) 203-4925 / (478) 755-8304

info@coolingtowersystems.com

Cooling Tower Systems, Inc.
196 Lower Cherry Street
Macon, GA 31201

Copyright © 2007 Cooling Tower Systems, Inc. All Rights Reserved.