Description
Engineering Information
***Please note: If purchased CTS, Inc. will need at least 2-4 weeks to build and prepare cooling tower for shipping and delivery.
Model T-2200
200 Nominal Tons based on design of 95/85/75 @ 592 GPM
| Fan Motor | 5 HP, 208-230/460V, 3PH, 60Hz *Electrical hookups are inside the junction box located on fan motor |
| Cooling Capacity | 3,000,000 BTU/Hr |
| Air Volume | 43,760 CFM |
| Water Inlet | 6″ |
| Water Outlet | 6″ |
| Tower Diameter | 148 3/8″ |
|
Tower Height
|
117 3/4″ |
| Operating Weight | 8,370 lbs. |
| Dry Weight | 1,918 lbs. |
| Flange Type | Round, 150# Cast Iron |
Please note: Field assembly will be required and will take approximately 15-20 man hours. If you would like a quote for CTS personnel to assemble on your job site, please request from the sales office.






