200 Ton Cooling Tower – Model T-2200
The Model T-2200 200 Ton Cooling Tower from Cooling Tower Systems is a heavy-duty FRP counterflow induced-draft cooling tower engineered for high-capacity industrial heat rejection. Rated at 200 nominal tons based on a 95°F / 85°F / 75°F design at 592 GPM, it delivers approximately 3,000,000 BTU/hr of cooling capacity with 43,760 CFM of airflow. Constructed from corrosion-resistant fiberglass, the Model T-2200 provides reliable long-term performance for demanding industrial applications. Complete engineering documentation, CAD drawings, assembly resources, and operating manuals are available to support installation, operation, and maintenance.
Key Features & Benefits
- 200 Ton Cooling Capacity
- 3,000,000 BTU/hr Heat Rejection
- 43,760 CFM Airflow
- Heavy-Duty FRP Construction
- Corrosion Resistant
- Industrial Grade Performance
- Low Maintenance Design
- Commercial & Industrial Applications
- Long Service Life
- Energy Efficient Operation
Technical Specifications
200 Nominal Tons based on design of 95/85/75 @ 592 GPM
| Specification | Value |
|---|---|
| Fan Motor | 5 HP, 208-230/460V, 3PH, 60Hz *Electrical hookups are inside the junction box located on fan motor |
| Cooling Capacity | 3,000,000 BTU/hr |
| Air Volume | 43,760 CFM |
| Water Inlet | 6″ |
| Water Outlet | 6″ |
| Tower Diameter | 148 3/8″ |
| Tower Height | 117 3/4″ |
| Operating Weight | 8,370 lbs. |
| Dry Weight | 1,918 lbs. |
| Flange Type | Round, 150# Cast Iron |
Assembly Information
| Assembly Details | Information |
|---|---|
| Factory Lead Time | Approximately 2–4 Weeks |
| Field Assembly | Required |
| Estimated Labor | 15–20 Man Hours |
| On-Site Assembly | CTS Assembly Services Available Upon Request |
Important: The Model T-2200 requires field assembly after delivery. Assembly typically requires approximately 15–20 man hours. If you would like Cooling Tower Systems personnel to perform the installation at your job site, please contact our sales office to request a quotation.
Typical Applications
- Large Manufacturing Facilities
- Data Centers
- Power Generation Plants
- Chemical Processing Facilities
- Oil & Gas Operations
- Steel & Metal Processing
- District Cooling Systems
- Heavy Industrial Process Cooling
Frequently Asked Questions
How much cooling capacity does the Model T-2200 provide?
The Model T-2200 is rated for 200 nominal tons and provides approximately 3,000,000 BTU/hr of heat rejection. It is designed around a 95°F / 85°F / 75°F cooling range while circulating 592 GPM, making it ideal for large industrial cooling systems.
Does the Model T-2200 require field assembly?
Yes. The Model T-2200 is shipped for field assembly and typically requires approximately 15–20 man hours to complete installation. Cooling Tower Systems can also provide on-site assembly services upon request.
What industries commonly install the Model T-2200 Cooling Tower?
The Model T-2200 is frequently used in data centers, power plants, chemical processing facilities, manufacturing operations, steel mills, district cooling systems, and other heavy-duty industrial applications requiring high-capacity heat rejection.
What type of water connections are included on the Model T-2200?
The Model T-2200 features 6-inch water inlet and outlet connections along with round 150# cast iron flanges, providing durable piping connections for high-flow industrial cooling systems.
Need Help Choosing the Right Cooling Tower?
Contact Cooling Tower Systems today for expert product recommendations, engineering assistance, and competitive pricing for your cooling tower project.