Description
Engineering Resources
Download installation guides, CAD drawings, specifications, assembly resources, and operating manuals.
150 Ton Cooling Tower – Model T-2150
The Model T-2150 150 Ton Cooling Tower from Cooling Tower Systems is a heavy-duty FRP counterflow induced-draft cooling tower designed for high-capacity industrial cooling. Rated at 150 nominal tons based on a 95°F / 85°F / 75°F design at 446 GPM, it delivers approximately 2,250,000 BTU/hr of cooling capacity with 33,260 CFM of airflow. Built for durability and corrosion resistance, the Model T-2150 provides dependable performance, long service life, and efficient heat rejection for demanding industrial cooling applications while offering complete engineering documentation and assembly resources.
Key Features & Benefits
- 150 Ton Cooling Capacity
- 2,250,000 BTU/hr Heat Rejection
- 33,260 CFM Airflow
- Heavy-Duty FRP Construction
- Corrosion Resistant
- Industrial Grade Performance
- Low Maintenance Design
- Commercial & Industrial Applications
- Long Service Life
- Energy Efficient Operation
Technical Specifications
150 Nominal Tons based on design of 95°F / 85°F / 75°F @ 446 GPM
| Specification | Value |
|---|---|
| Fan Motor | 5 HP, 208-230/460V, 3PH, 60Hz *Electrical hookups are inside the junction box located on fan motor |
| Cooling Capacity | 2,250,000 BTU/hr |
| Air Volume | 33,260 CFM |
| Water Inlet | 6″ |
| Water Outlet | 6″ |
| Tower Diameter | 130″ |
| Tower Height | 90″ |
| Operating Weight | 6,181 lbs. |
| Dry Weight | 1,377 lbs. |
| Flange Type | Round, 150# Cast Iron |
Assembly Information
| Assembly Details | Information |
|---|---|
| Factory Lead Time | Approximately 2–4 Weeks |
| Field Assembly | Required |
| Estimated Labor | 15–20 Man Hours |
| On-Site Assembly | CTS Assembly Services Available Upon Request |
Important: The Model T-2150 requires field assembly after delivery. Assembly typically requires approximately 15–20 man hours. If you would like Cooling Tower Systems personnel to assemble the cooling tower at your job site, please contact our sales office for a quotation.
Typical Applications
- Large Manufacturing Plants
- Power Generation Facilities
- Chemical Processing Plants
- Petrochemical Facilities
- Steel & Metal Processing
- District Cooling Systems
- Large HVAC Installations
- Heavy Industrial Process Cooling
Frequently Asked Questions
What makes the Model T-2150 suitable for large industrial cooling applications?
The Model T-2150 is designed for demanding industrial environments with a cooling capacity of 150 nominal tons, approximately 2,250,000 BTU/hr of heat rejection, and 33,260 CFM of airflow. Its heavy-duty FRP construction and 6-inch water connections make it ideal for high-capacity cooling systems.
How is the Model T-2150 installed after delivery?
The Model T-2150 requires field assembly after delivery. Cooling Tower Systems recommends allowing approximately 15–20 man hours for assembly. Customers who prefer professional installation can request on-site assembly services from the CTS sales team.
What engineering resources are available for the Model T-2150?
Cooling Tower Systems provides complete engineering support for the Model T-2150, including specification drawings, CAD drawings, assembly instructions, assembly videos, fan assembly specifications, and operating manuals to simplify installation and long-term maintenance.
Need Help Choosing the Right Cooling Tower?
Contact Cooling Tower Systems today for expert product recommendations, engineering assistance, and competitive pricing for your cooling tower project.





