Model T-2150

Description

Engineering Resources

Download installation guides, CAD drawings, specifications, assembly resources, and operating manuals.

Tower Specifications

CAD Drawings

Assembly Instructions

Assembly Video

Fan Assembly Specs

Operating Manual

Important: Please allow approximately 2–4 weeks for Cooling Tower Systems to manufacture and prepare the Model T-2150 for shipment.

150 Ton Cooling Tower – Model T-2150

The Model T-2150 150 Ton Cooling Tower from Cooling Tower Systems is a heavy-duty FRP counterflow induced-draft cooling tower designed for high-capacity industrial cooling. Rated at 150 nominal tons based on a 95°F / 85°F / 75°F design at 446 GPM, it delivers approximately 2,250,000 BTU/hr of cooling capacity with 33,260 CFM of airflow. Built for durability and corrosion resistance, the Model T-2150 provides dependable performance, long service life, and efficient heat rejection for demanding industrial cooling applications while offering complete engineering documentation and assembly resources.

Key Features & Benefits

  • 150 Ton Cooling Capacity
  • 2,250,000 BTU/hr Heat Rejection
  • 33,260 CFM Airflow
  • Heavy-Duty FRP Construction
  • Corrosion Resistant
  • Industrial Grade Performance
  • Low Maintenance Design
  • Commercial & Industrial Applications
  • Long Service Life
  • Energy Efficient Operation

Technical Specifications

150 Nominal Tons based on design of 95°F / 85°F / 75°F @ 446 GPM

Specification Value
Fan Motor 5 HP, 208-230/460V, 3PH, 60Hz
*Electrical hookups are inside the junction box located on fan motor
Cooling Capacity 2,250,000 BTU/hr
Air Volume 33,260 CFM
Water Inlet 6″
Water Outlet 6″
Tower Diameter 130″
Tower Height 90″
Operating Weight 6,181 lbs.
Dry Weight 1,377 lbs.
Flange Type Round, 150# Cast Iron

Assembly Information

Assembly Details Information
Factory Lead Time Approximately 2–4 Weeks
Field Assembly Required
Estimated Labor 15–20 Man Hours
On-Site Assembly CTS Assembly Services Available Upon Request

Important: The Model T-2150 requires field assembly after delivery. Assembly typically requires approximately 15–20 man hours. If you would like Cooling Tower Systems personnel to assemble the cooling tower at your job site, please contact our sales office for a quotation.

Typical Applications

  • Large Manufacturing Plants
  • Power Generation Facilities
  • Chemical Processing Plants
  • Petrochemical Facilities
  • Steel & Metal Processing
  • District Cooling Systems
  • Large HVAC Installations
  • Heavy Industrial Process Cooling

Frequently Asked Questions

What makes the Model T-2150 suitable for large industrial cooling applications?

The Model T-2150 is designed for demanding industrial environments with a cooling capacity of 150 nominal tons, approximately 2,250,000 BTU/hr of heat rejection, and 33,260 CFM of airflow. Its heavy-duty FRP construction and 6-inch water connections make it ideal for high-capacity cooling systems.

How is the Model T-2150 installed after delivery?

The Model T-2150 requires field assembly after delivery. Cooling Tower Systems recommends allowing approximately 15–20 man hours for assembly. Customers who prefer professional installation can request on-site assembly services from the CTS sales team.

What engineering resources are available for the Model T-2150?

Cooling Tower Systems provides complete engineering support for the Model T-2150, including specification drawings, CAD drawings, assembly instructions, assembly videos, fan assembly specifications, and operating manuals to simplify installation and long-term maintenance.

Need Help Choosing the Right Cooling Tower?

Contact Cooling Tower Systems today for expert product recommendations, engineering assistance, and competitive pricing for your cooling tower project.

Request a Quote →

Additional information

Weight 2500.0 lbs
hidden

0

Motor Specifications

208V/230V/460V, 3PH, 60Hz

config

{"use_shopify_meta_control":"yes","focusKeyword":"Cooling Tower","title_template_force":"no","robots_index":"yes","robots_follow":"yes","robots_noimageindex":"no","robots_noarchive":"no","robots_nosnippet":"no","robots_noodp":"no","google_notranslate":"no","google_unavailable_after":"no","google_unavailable_after_date":"","metaRedirect_enabled":"no","metaRedirect_url":"","sitemapRemove":"no"}

5a81f93c1edd8

{"131615_1515894428658236_5000844835493066310_o_405.jpg":{"original_filename":"131615_1515894428658236_5000844835493066310_o.jpg","original_timestamp":1518431804,"position":1,"variant_ids":[],"width":1024,"height":768,"optimized":"a5a17cd2c47548770bc3cd77f4ccf8b4","version":1518467380,"md5":"59503b55348f2e5ba2c1a31ee4e9cd0c","type":"imagecloud"},"70tontransparent_815.jpg":{"original_filename":"70tontransparent_4446e802-ebbd-4f1c-ba59-9eeecee019c5.png","original_timestamp":1518431804,"position":2,"variant_ids":[],"width":895,"height":819,"optimized":"a5a17cd2c47548770bc3cd77f4ccf8b4","version":1518467380,"md5":"ff1487ed1955d3e00deef91a95f848c5","type":"imagecloud"}}

5a81f985f3ca9

{"131615_1515894428658236_5000844835493066310_o_129.jpg":{"original_filename":"131615_1515894428658236_5000844835493066310_o.jpg","original_timestamp":1518431804,"position":1,"variant_ids":[],"width":1024,"height":768,"optimized":"4a0bcb900c96ae168d1288a22468248a","version":1518467456,"md5":"823c2a41e553601fbadebe6659cf0693","type":"imagecloud"},"70tontransparent_763.jpg":{"original_filename":"70tontransparent_4446e802-ebbd-4f1c-ba59-9eeecee019c5.png","original_timestamp":1518431804,"position":2,"variant_ids":[],"width":895,"height":819,"optimized":"4a0bcb900c96ae168d1288a22468248a","version":1518467456,"md5":"c49e2718641a19fc35ab3c03a5d4f32f","type":"imagecloud"}}

condition

new

custom_product

true

mpn

T-2150 Cooling Tower

unit_pricing_measure

1000

unit_pricing_measure_unit

lb