Description
Engineering Resources
Download installation guides, CAD drawings, specifications, assembly resources, and operating manuals.
200 Ton Cooling Tower – Model T-2200
The Model T-2200 200 Ton Cooling Tower from Cooling Tower Systems is a heavy-duty FRP counterflow induced-draft cooling tower engineered for high-capacity industrial heat rejection. Rated at 200 nominal tons based on a 95°F / 85°F / 75°F design at 592 GPM, it delivers approximately 3,000,000 BTU/hr of cooling capacity with 43,760 CFM of airflow. Constructed from corrosion-resistant fiberglass, the Model T-2200 provides reliable long-term performance for demanding industrial applications. Complete engineering documentation, CAD drawings, assembly resources, and operating manuals are available to support installation, operation, and maintenance.
Key Features & Benefits
- 200 Ton Cooling Capacity
- 3,000,000 BTU/hr Heat Rejection
- 43,760 CFM Airflow
- Heavy-Duty FRP Construction
- Corrosion Resistant
- Industrial Grade Performance
- Low Maintenance Design
- Commercial & Industrial Applications
- Long Service Life
- Energy Efficient Operation
Technical Specifications
200 Nominal Tons based on design of 95/85/75 @ 592 GPM
| Specification | Value |
|---|---|
| Fan Motor | 5 HP, 208-230/460V, 3PH, 60Hz *Electrical hookups are inside the junction box located on fan motor |
| Cooling Capacity | 3,000,000 BTU/hr |
| Air Volume | 43,760 CFM |
| Water Inlet | 6″ |
| Water Outlet | 6″ |
| Tower Diameter | 148 3/8″ |
| Tower Height | 117 3/4″ |
| Operating Weight | 8,370 lbs. |
| Dry Weight | 1,918 lbs. |
| Flange Type | Round, 150# Cast Iron |
Assembly Information
| Assembly Details | Information |
|---|---|
| Factory Lead Time | Approximately 2–4 Weeks |
| Field Assembly | Required |
| Estimated Labor | 32 Man Hours (4 workers, 8 hours each) |
| On-Site Assembly | CTS Assembly Services Available Upon Request |
Important: The Model T-2200 requires field assembly after delivery. Assembly typically requires approximately 32 man-hours (4 workers, 8 hours each). If you would like Cooling Tower Systems personnel to perform the installation at your job site, please contact our sales office to request a quotation.
Before delivery, review the rigging, slinging, and lifting guide. Models T-2200 through T-3500 are lifted with four equal straps spaced 90 degrees apart under the truss pipes and ring #1, with a guide line on the fan motor eye bolt. See how factory assembly compares with site-built towers in factory-assembled vs field-erected cooling towers.
Related reading: cooling towers for data centers, FRP vs galvanized steel, and the 20-year total cost of ownership for FRP towers. Need a smaller tower? See the 175-ton T-2175. Need more capacity? See the 225-ton T-2225.
Typical Applications
- Large Manufacturing Facilities
- Data Centers
- Power Generation Plants
- Chemical Processing Facilities
- Oil & Gas Operations
- Steel & Metal Processing
- District Cooling Systems
- Heavy Industrial Process Cooling
Frequently Asked Questions
How much cooling capacity does the Model T-2200 provide?
The Model T-2200 is rated for 200 nominal tons and provides approximately 3,000,000 BTU/hr of heat rejection. It is designed around a 95°F / 85°F / 75°F cooling range while circulating 592 GPM, making it ideal for large industrial cooling systems.
Does the Model T-2200 require field assembly?
Yes. The Model T-2200 is shipped for field assembly and typically requires approximately 32 man-hours (4 workers, 8 hours each) to complete installation. Cooling Tower Systems can also provide on-site assembly services upon request.
What industries commonly install the Model T-2200 Cooling Tower?
The Model T-2200 is frequently used in data centers, power plants, chemical processing facilities, manufacturing operations, steel mills, district cooling systems, and other heavy-duty industrial applications requiring high-capacity heat rejection.
What type of water connections are included on the Model T-2200?
The Model T-2200 features 6-inch water inlet and outlet connections along with round 150# cast iron flanges, providing durable piping connections for high-flow industrial cooling systems.
Need Help Choosing the Right Cooling Tower?
Contact Cooling Tower Systems today for expert product recommendations, engineering assistance, and competitive pricing for your cooling tower project.






