CTS News CTS News – Cooling Tower Systems, Inc.
NOW OFFERING *FREE* GROUND SHIPPING FOR ALL ONLINE ORDERS WITHIN THE CONTINENTAL UNITED STATES!

CTS News

RSS
Cooling Tower Life Expentancy

Cooling Tower Life Expentancy

There are a few factors that determine the life expectancy for our counter-flow, induced-draft FRP (fiberglass reinforced polyester) cooling towers.

1. Maintenance and up keep
2. Water quality
3. Uses of chemicals and bleeds on cooling tower

Generally speaking the longevity of our cooling towers should last a minimum of 25-30 years. CTS offers a 20 year warranty on all FRP cooling tower components- which is the longest in the industry.

The longest CTS, Inc. has been representing towers is 30 years and the oldest were (2) T-220 on the east coast of Florida, and were in place for 42 years.
  • Joe Coates
Winterization Kits

Winterization Kits

CTS been selling the FRP (fiberglass reinforced polyester) cooling tower for the past 63 years into North and South America- to include the severe cold climates of Canada and Alaska. Cold climate does not affect the materials our cooling towers are constructed of, which we have the longest warranty in the industry for.

Instead of using the cold water basin for your processed water, the most preferred winterization method in a cold climate is to elevate the cooling tower outside until thermal performance is achieved. Once achieved, the process water should gravity fall into a remote process water tank that is placed inside a controlled atmosphere.

The second method would be using immersion heaters with a thermostat to keep the cold water basin from freezing.

If you would like a formalized quotation with complete submittals, Please follow the below links to make your request:

Immersion Heater Quote Form

Storage Tank Quote Form

We've moved!

We've moved!

A few years ago, CTS' offices were moved to a showroom away from the warehouse location while construction broke on their new office space. That office space is finally completed and our office is crew is right where they belong!

Keeping both facilities together eases production and communication.

Please note our new address for mailing and shipping purposes:
196 Lower Cherry Street, Macon, GA 31201

 

  • Joe Coates
T-2350 Assembly

T-2350 Assembly

A new facility in North Carolina just installed a brand new mode T-2350 FRP cooling tower.  This customer opted for our OSHA approved ladders with safety cages and hand rails. There is also a small catwalk up top for easy work access!





  • Joe Coates
New Accessory Available!

New Accessory Available!

CTS is excited to announce that we now have *NEW* OSHA approved ladders to include handrails and safety cages.  This new additional is available by special order only.  Estimated lead times vary by cooling tower size. Call us today to inquire about this amazing add-on!

*Pictures show field assembly on a T-2250 in Camp Hill, PA*


  • Joe Coates